Precision Installation
Total project management from first measurement to final polish.
The White Glove Standard

Installation is not an afterthought

Too many beautiful kitchens are ruined by poor installation. At Sage & Stone, installation is where our obsession with detail truly shows. Every gap, every alignment, every finish--measured to the millimetre.

Millimetre-perfect is not a goal. It is the baseline.

The Process
Five Phases to Completion
Every installation follows our proven methodology.
  1. 01

    Consultation

    Site survey, design brief, and feasibility assessment.

  2. 02

    Strip-Out

    Careful removal of existing fixtures with full site protection.

  3. 03

    Installation

    Precision fitting of cabinetry, worktops, and integrated appliances.

  4. 04

    Calibration

    Fine-tuning of doors, drawers, and hardware for perfect operation.

  5. 05

    Handover

    Full demonstration, documentation, and aftercare guidance.

What We Handle
Complete Project Management
Featured Service

Appliance Integration

SS_SERVICE_APPLIANCE

Seamless fitting of all integrated appliances, from refrigeration to extraction.

Coming Soon
01

Bespoke Joinery

SS_SERVICE_JOINERY

On-site adjustments and custom fitting to accommodate period properties.

02

Technical Integration

SS_SERVICE_TECHNICAL

Plumbing, electrical, and gas connections by certified specialists.

03

Stone & Surfaces

SS_SERVICE_STONE

Precision templating and installation of worktops and splashbacks.

The Cleanliness Pledge
Four Guarantees

Your home deserves the same respect as our workshop.

Featured Service

Daily Clean

Work areas cleaned and vacuumed at the end of every day.

Coming Soon
01

Floor Protection

Heavy-duty floor coverings throughout the project duration.

02

Dust Extraction

Industrial extraction at source for all cutting and sanding.

03

Sealed Zones

Work areas sealed from living spaces with temporary partitions.

The Details
Obsession in every joint
Hand-cut dovetail joint detail
Precision hinge alignment
Hand-finished oak surface
Certifications & Memberships
Gas Safe Registered
NICEIC Approved
BiKBBI Member
Guild of Master Craftsmen
Common Questions
Installation FAQs

Installation typically begins 10-12 weeks after design approval, allowing time for material sourcing and workshop production. The installation phase itself takes 2-3 weeks depending on project scope.